Home / Control

Control

Know what is compliant.And what still needs checking.

Run your institution’s controls, read their evidence and find exceptions in their context. Missing data stays not verifiable.

Four results

Four results, four readings.

Every control keeps its date, its result and the data examined.

Compliant

The control examined the data and the rule is met.

To watch

The result calls for attention, without being a breach.

Non-compliant

The exception is found in its context, with the data examined.

Not verifiable

Data is missing: RIO says exactly which.

A case in point

Absence of evidence does not become a green light.

A not verifiable result is neither compliance nor non-compliance. It states what is missing, and the item goes to the “To handle” queue.

  • Standard controls and your own rules
  • Evidence attached to every result
  • Exceptions found in their context
  • What is missing is named, never guessed
Absence of evidence does not become a green light.

The scope

Controls suited to your institution.

What you control

  • Standard controls offered by RIO
  • Rules specific to your institution
  • Scope according to rights and modules turned on

What you read

  • The date and result of every run
  • The data examined and its source
  • Exceptions and the decisions that follow
Request a demoRequest a demo

↑ ↓ to choose · Enter to open · Esc to close